Amara Golf Villas 2

Haute Rive, Rivière du Rempart

Amara Golf Villas 2

About this development

Amara Golf Villas 2 is BlueLife’s 20-home phase in Azuri’s Rive Droite neighbourhood at Haute Rive. Its June 2024 brochure identifies a 10,561 m² site, with 11 plots facing The Nine golf course and 9 facing a tropical park. This phase is separate from the earlier 18-home Amara Golf Villas 1 development.

Four villa configurations

The advertised range combines single-storey and two-storey homes with 2 or 3 bedrooms. Each design opens towards a private garden through living and dining spaces connected to the kitchen. The brochure includes laundry, storage or utility space, guest WC and bedroom dressing areas. Optional items include a third-bedroom extension, outdoor living areas, pools, decks and covered parking, depending on the chosen configuration.

Areas and plots

Phase 2’s plot schedule runs from 395 m² to 462 m². The single-storey 2-bedroom design has 120.41 m² gross internal area and 138.81 m² total covered area; its 3-bedroom option has 136.88 m² and 170.22 m² respectively. The two-storey 2-bedroom design has 140.26 m² gross internal and 170.99 m² total covered area; the 3-bedroom option has 156.73 m² and 219.80 m². Gross measurements include walls and must not be treated as net usable living space.

Sales and construction

The current project catalogue marks the original allocation sold out. The developer’s timeline states that Amara 2 construction began in October 2025, with delivery targeted for Q1 2027. The target is not a completed handover or guarantee. No current individual stock or asking price is asserted here.

Azuri’s golf, beach, shops, restaurants and sports facilities form the wider village setting. Access, memberships and charges depend on operator terms and the property contract. Artist’s impressions and historical construction photography are labelled separately; the brochure illustrates original designs and optional additions.

BlueLife’s Annual Report 2026 confirms that Amara Golf Villas 2 was under construction at 30 June 2026 and progressing ahead of forecast. This supports the construction stage; it is not a completed-development announcement.

Location

Quartier de la Rive Droite, Azuri, Haute Rive. The map pin shows the approximate project vicinity, located by comparing Google Maps satellite imagery with the developer’s masterplan. It is a location guide, not a surveyed boundary or a verified entrance.

Residences

Layouts describe the homes advertised by the developer. They do not confirm individual stock or availability.

A closer look

Explore the development

Browse the spaces, study the plans and explore the available project resources.

Gallery

Amenities and features

  • Balconies

    Terraces vary by configuration; some covered terraces optional

  • Covered parking

    Covered carport35.94sqm optional

  • Fitted kitchen

    Open kitchen in original layouts

  • Golf course frontage

    11phase2plots face golf;9face park, not universal frontage

  • Guest WC

    Guest WC in original layouts

  • Laundry

    Laundry in original layouts

  • Private garden

    Private landscaped gardens

  • Private pool

    Optional pools: masonry21.64sqm or plunge10.04sqm; fibreglass alternatives in brochure

  • Storage

    Utility and storage areas according to configuration

Project timeline

Now

Construction

Ground breaks and the building rises.

Buying now: off-plan, paid in stages as the build reaches each milestone.

  • Amara2 historical construction aerial from official developer timeline; not a current site survey.

Prices and buying

Project details

Reviewed project-level information. Confirm the terms for your chosen unit with the project team.

Not yet confirmed: foreign-buyer eligibility, beachfront, and property scheme.

Location

Haute Rive, Rivière du Rempart

The nearest shops, schools, beaches and services, with the way there.

Finding what’s nearby…

Project team

BlueLife Limited

Developer

BlueLife Limited

View developer profile

Ask about this development

  1. Your question · you are here
  2. With the team · still to come
  3. Their reply · still to come

Tap a topic to add it to your message, or write in your own words.

Your enquiry is routed to the responsible property team through Collection.